1 preparation for on-grid operation, 2 preparation for off-grid operation – KACO blueplanet gridsave eco 5.0 TR1 User Manual

Page 21

Advertising
background image

Installation

Operating instructions for blueplanet-gridsave eco_EN

Page 21

Authorised electrician

7.1.1

Preparation for on-grid operation

NOTE

The tie circuit-breakers mean that both the conductor and the neutral conductor are disconnected.

Ensure that the ground reference is present in case the Powador-protect disconnects the system

from the grid!

A residual current circuit breaker type A (RCD) with a maximum tripping current of 0.3A should

be used on the output of the device. These devices open both the active and neutral conductors,

meaning that the device must be installed on the grid side of this circuit breaker.

N

L

L

L

N

N

PE

RCD

RCD

Powador

Protect

gridsave eco

Output

Input

Tester

Main

switch

Grid

connection

Grounding

PEN

disconnection

Supply from the

public grid

Supply via gridsave

eco if grid fails

Possible

isolator

Figure 9: Simplified wiring diagram for on-grid internal consumption systems with emergency power consumption

7.1.2 Preparation for off-grid operation

RCD

Type A

E

gridsave eco

L N

N L

E

Main switch

E-N Link

Outgoing

building network

Output Input

Generator

L

Connection box

N

E

E

Figure 10: Wiring diagram for off-grid operation

Advertising