Emerson Process Management Bristol ControlWave ExpressPAC User Manual

Page 20

Advertising
background image

ControlWave ExpressPAC Instruction Manual (CI-ControlWave EPAC)

2-6 Installation

Revised

Mar-2011

 If your unit requires a solar panel, you can mount it to the same 2

inch pipe that holds the controller. Make sure there is adequate
clearance for the solar panel. For more information on the solar
panel, see Section 2.3.5.

 Only connect power wiring after the unit is mounted and properly

grounded.

 I/O wiring, external power wiring, RTD wiring, antenna cabling,

and communication port cabling enters the bottom of the unit
through conduit or special function fittings. (See Figure 2-3.) I/O
wiring is routed through the left side of the unit (right when facing
the front) via a ¾ inch conduit fitting.

Figure 2-3. ControlWave ExpressPAC Bottom View

.

Advertising