COMPLETE THE STOVE AND SMOKE PIPE INSTALLATION BEFORE PLACING THESE BRICKS.

When replacing bricks, use only pumas type fire bricks.

TOTAL BRICKS:
12 - Full size bricks 9” long x 4.5” wide x 1.25” thick

(22.9 cm long x 11.4 cm wide x 3.2 cm thick)

2 - Partial bricks 9” long x 3” wide x 1.25” thick

(22.9 cm long x 7.6 cm wide 3.2 cm thick)

Removing Air Tube: If a secondary air tube needs to be removed, place a screwdriver (any style except

flat head) into one of the air holes and tap it with a hammer/mallet to the left until the right end of the

tube is freed. To installation a secondary air tube reverse the above instructions.
IMPORTANT: All secondary air tubes must be in place for proper operation.

Par

tia

l B

rick

Ful

l Si

ze

Bri

ck

Tube A

Tube E

Tube D

Ful

l Si

ze

Bri

ck

Figure 21: Brick Placement for 1200-V shown with Secondary Air

Channel and Tubes.

1. Place the three (3) full size

bricks along each side of the

firebox and one (1) full size

brick on either side of the back

of the firebox.

2. To place the floor bricks, lay

the two (2) partial bricks along

the back of the floor. Then on

the left, lay two (2) full size

bricks and on the right, lay a

full size brick in the center and

the half brick in the front (for

the ash dump). The spaces

between the bricks will soon

fill with ashes.