Model 1700-v brick placement & tube locations, Installation – Enviro Venice User Manual

Page 22

Advertising
background image

22

Installation

M

ODEL

1700-V B

RICK

P

LACEMENT

& T

UBE

L

OCATIONS

:

COMPLETE THE STOVE AND SMOKE PIPE INSTALLATION BEFORE PLACING THESE BRICKS.

When replacing bricks, use only pumas type fire bricks.
TOTAL BRICKS:
16 - Full size bricks 9” long x 4.5” wide x 1.25” thick

(22.9 cm long x 11.4 cm wide x 3.2 cm thick)

2 - Partial bricks 9” long x 3” wide x 1.25” thick

(22.9 cm long x 7.6 cm wide 3.2 cm thick)

Removing Air Tube: If a secondary air tube needs to be removed, place a screwdriver (any style except

flat head) into one of the air holes and tap it with a hammer/mallet to the left until the right end of the

tube is freed. To installation a secondary air tube reverse the above instructions.
IMPORTANT: All secondary air tubes must be in place for proper operation.

Full S

ize Br

ick

Partia

l Brick

Tube A

Tube C

Tube B

Full S

ize Br

ick

Full S

ize Br

ick

Figure 22: Brick Placement for 1700-V shown with Secondary Air Channel

and Tubes.

1. Place the four (4) full size

bricks along each side of

the firebox and one (1) full

size brick on either side of

the back of the firebox.

2. To place the floor bricks, lay

the two (2) partial bricks

along the back of the floor.

Then on the left, lay three

(3) full size bricks and on

the right, lay two (2) full

size bricks in the center and

the half brick in the front

(for the ash dump). The

spaces between the bricks

will soon fill with ashes.