Ptg109 service – Subaru Robin PKX201 User Manual

Page 15

Advertising
background image

PTG109

Service

- 15 -

44. After adding priming water and fuel, start the unit and

check with test vacuum plate to make sure there are

no vacuum leaks.

The recommended vacuum reading at sea level should

be 25 lbs of vacuum.

43. Pull the engine over by the start pull cord, making sure

nothing is binding in the pump.

42. Tighten the three outer bolts, making sure not to over

tighten. The gasket will be distorted and squeezed

when overtightening these bolts.

The recommend tightenting torque is 3.3 to 4.8 ft. lbs.

41. This picture shows the correct placement of the gasket

to the intake nozzle housing.

Advertising
This manual is related to the following products: