Trash pumps - pkx service – Subaru Robin PKX201 User Manual

Page 54

Advertising
background image

Trash Pumps - PKX

Service

- 54 -

45. Position the volute back onto the front pump housing.

Note position when installing, as it is important which

way volute discharge faces. See step 3 for the correct

volute position as is installed on front pump housing.

46. Apply thread lock compound to the bolts before

installing. Using Permatex® brand such as the blue or

purple is recommened. These models are service

replaceable.

47. Torque to bolts to the specifi ed value of 12 to 15
ft.

lbs.

48. The volute and front pump housing are now ready to

be installed onto pump back plate.

Advertising
This manual is related to the following products: