Notes for tables 6 and 7, Lanning, Va, s – Emerson Series 610 User Manual

Page 47: Ingle, Odule, Ystems, D appendix a, To appendix a, E appendix a . be sure environment, Appendix a

Advertising
background image

Site Pla

n

n

in

g

Da
ta

, 10
00kV

A, Sin

g

le-Mod

u

le Sys

te

m

s

43

A

PPENDIX

A - S

ITE

P

LANNING

D

ATA

, 1000

K

VA, S

INGLE

-M

ODULE

S

YSTEMS

Notes for Tables 6 and 7

1. Nominal rectifier AC input current (considered continuous) is based on full

rated output load. Maximum current includes nominal input current and

maximum battery recharge current (considered noncontinuous). Continuous

and noncontinuous current limits are defined in NEC 100. Maximum input

current is controlled by current limit setting, which is adjustable. Values

shown for maximum settings are 125% of nominal input current. Standard

factory setting is 115%.

2. Nominal AC output current (considered continuous) is based on full rated

output load. Maximum current includes nominal output current and

overload current for 10 minutes.

3. Bypass AC input current (considered continuous) is based on full rated

output load.

4. Feeder protection (by others in external equipment) for rectifier AC input

and bypass AC input is recommended to be provided by separate overcurrent

protection devices.

5. UPS output load cables must be run in separate conduit from input cables.
6. Power cable from module DC bus to battery should be sized for a total

maximum 2.0 volt line drop (power cable drop plus return cable drop as

measured at the module) at maximum discharge current.

7. Grounding conductors to be sized per NEC 250-95. Neutral conductors to be

sized for full capacity—per NEC 310-16, Note 10—for systems with 4-wire
loads and half capacity for systems with 3-wire loads.

8. Rectifier AC Input: 3-phase, 3-wire, plus ground

AC Output to Load: 3-phase, 3- or 4-wire, plus ground
Bypass AC Input: 3-phase, 4-wire, plus ground (3-wire in some circumstances)
Module DC Input from Battery: 2-wire (positive and negative), plus ground

9. All wiring is to be in accordance with National and Local Electrical Codes.
10. Minimum overhead clearance is 2 ft. (0.6m) above the UPS.
11. Top or bottom cable entry through removable access plates. Cut plate to suit

conduit size.

12. Control wiring and power cables must be run in separate conduits. Control

wiring must be stranded tinned conductors.

13. 4% maximum reflected input harmonic current and 0.92 lagging input power

factor at full load with optional 12-pulse rectifier and optional input filter.

14. UPS module will be shipped in sections. Reconnect shipping splits according

to drawings supplied with the equipment.

Maintenance bypass switchgear

AC output

to load

Battery

MBD

UOB

SBB

MIB

MBB

UPS module

Bypass

AC input

Rectifier

AC input

CB1

Advertising