Controls and indicators, On/manual battery test button, Standby/manual bypass button – Emerson LIEBERT GXT5000R-208 User Manual

Page 14: Ontrols, Ndicators

Advertising
background image

10

CONTROLS AND INDICATORS

ON/Manual Battery Test button

This button controls output power to connected load(s) and has two functions:

• Transfer load to inverter
• Manual battery test

Pressing the ON/Manual Battery Test button will transfer the load from bypass to

inverter in order to provide conditioned and protected power to the output power

receptacles. If the output is turned off using the Standby button

, pressing the ON

button will restart the load directly from the inverter.
To initiate a manual battery test, press the ON/Manual Battery Test button for at

least one second while operating from utility power and no alarm conditions are

present.
The manual battery test should be initiated with fully charged batteries (all Battery

Capacity LEDs on). The Battery Capacity LEDs will flash during the battery test.

Standby/Manual Bypass button

This button controls output power to connected load(s) and has dual functions:

• Standby
• Manual bypass

!

CAUTION
Pressing the Standby/Manual Bypass button during normal

operation while the inverter is on will transfer the load to bypass

power, if the bypass voltage and frequency are within a safe range.
Pressing the Standby/Manual Bypass button when the UPS is in

bypass mode will shut off power to the output receptacles and

connected loads. Turning the unit off leaves the UPS in standby

mode. To fully isolate the load from power, open the input circuit

breaker.

ON/Manual battery test

(Transfer to inverter)

On Inverter

indicator

Fault

indicator

Battery capacity

indicators

On bypass

indicator

Load level

indicators

Standby/Manual bypass

(Transfer to bypass)

1-3

5%

36-5

5%

56-7

5%

76-9

5%

96-10

5%

OV

ERL

O

AD

1-35

%

36-55

%

56-75

%

76-95

%

96-100

%

AC input

indicator

Advertising