R7426A,B,C TEMPERATURE CONTROLLER WITH AND WITHOUT REAL-TIME CLOCK

EN1B-0203GE51 R0507C

2

WIRING

Screwless type, spring loaded terminals are provided on
the controllers for panel and field wiring. These terminals
are suitable for solid conductors as well as tinned or with
multicore cable end, stranded wires up to 1.5 mm

2

. To

make a termination, push the wire into the terminal or insert
a small screwdriver from the front of the controller into the
spring-release hole and insert the wire. Check for proper
connection by short pull on the wire.

Table 1.

Terminal Connection

controller to CPA/SPA potentiometer

R7426A,B,C T7412B1016

T7412B1057/1008
T7412C1030/1006

T7412B1024
T7412B1040

terminal 2

terminal 4

terminal 4

terminal 4

terminal 4

terminal 5

terminal 6

terminal 5+6

R7426A,B,C 43193982-001

-

-

terminal 2

terminal 1

-

-

terminal 4

terminal 3

-

-

Table 2. Wire Dimensions

length max.

wiring run

type of

wires

1.0 mm

2

1.5 mm

2

from controller to all
input and output
devices

local
standard

100 m

150 m

W303

Fig. 2. Parallel Connection of Compensation Sensor T3

Table 3. Jumper States

jumper

1)

state

description

closed

T3 supplied by this controller

W303

open

T3 supplied from another
controller

1)

Default jumper position = closed. Cut (open) jumper W303

only if the T3 input is fed from another controller (parallel
connection, max. six devices). This disconnects the T3 input
from the internal power supply

Wiring should be done only according to the actual job
wiring diagrams or wiring diagrams shown in the mounting
instruction sheet EN1B-0202GE51. The wiring to the
CPA/SPA potentiometers is described in Table 1. All wiring
must conform to applicable codes, ordinances, and
regulations. The maximum allowed wiring length per wire
size are shown in Table 2.

POWER SUPPLY AND GROUNDING

1. Refer to job drawings and verify correct supply voltage to

transformer (230 Vac) and controller (24 Vac).

2. Connect line power conductors to transformer primary.

Line power must be supplied from a breaker panel with
dedicated controller circuit. Do not turn the line power on
until all wiring has been checked against job drawings.

3. Connect transformers 24 Vac secondary to the controller

terminals 18 and 19. Connect one conductor to terminal
marked 24 V

∼ and the other to terminal marked 24 V⊥. If

controllers are interconnected all terminals 19 must be
connected to the same potential 24 V

⊥ level.

4. Do not connect the secondary side of the transformer to

the installation ground.