Furuno SEARCHLIGHT CH-250 User Manual

Page 26

Advertising
background image

16

Protection sponge

Rotate 4 or 5
turns by hand
to make sure
that turning
mechanisms
are functioning
properly.

O-ring

Remove.

Socket head cap screw
10pcs, M5x30

Spring washer

Soundome

Apply KINORUSTER.

Detaching the soundome

16. Throw away protection sponge placed in soundome.

17. Stand the soundome upright on top of the soundome packing. Fill the soundome with oil

(supplied) so the level is 5 cm on the top of the soudome. Keep the soundome packing for
future use.

Sonar oil

Stand the soundome upright
on top the soundome packing.

Ball wrench

5 cm

Filling the soundome with sonar oil

Advertising