Field Controls Heat Recovery Ventilator FC95HRV. User Manual

Page 25

Advertising
background image

25

Installation of the DHVC Ventilation Control with 20/40/60 Minute Timers (test c)

1

2

3

4

5

6

7

8

9

10

LO

ON

R

Y

G

HI

C

NO

NC

BK

FACTORY-INSTALLED JUMPER
FOR STANDBY-OFF OPERATION.
SEE “SETTING STANDBY” SECTION
OF INSTALLATION INSTRUCTIONS

LO

HI

24C

R

C

W

Y

G

R

Y

W

G

THERMOSTAT

FURNACE OR
HEAT PUMP

HRV/ERV WIRING TERMINALS

12V/24 VAC Field wiring, 20 AWG min. required

* Connect V Terminal on the HHSC Control to the Hi Terminal (instead of Lo) for a shorter ventilation period.
** One DH-1 Dehumidistat and/or one or more VTC timer controls may be connected as shown. Connect all

Red, Yellow, and Green control terminals to the corresponding HRV/ERV terminals.

R

Y

G

Y

R
G

Y

R

G

VTC VENT TIMER CONTROL
(OPTIONAL)**

VTC VENT TIMER CONTROL
(OPTIONAL)**

DHVC VENTILATION
CONTROL

NOTE: These connections are not necessary

if the system is configured as fully
dedicated (no central HVAC connections).

%

80

20

HIGH

Advertising