4 power-on sequence – FUJITSU MAM3184MC/MP User Manual

Page 121

Advertising
background image

C141-E134-01EN

8 - 5

8.4

Power-On Sequence

Figure 8.2 shows the operation sequence of the IDD at power-on. The processes shown in this
figure are explained below:

1) After the power is turned on, the IDD executes self-diagnosis 1 (MPU bus test, internal register

write/read test, and work RAM write/read test).

2) When self-diagnosis 1 terminates successfully, the IDD activates the spindle motor when the

motor start mode is set (SW1 is on; default setting at factory shipment).

3) The IDD executes self-diagnosis 2 (data buffer write/read test).

4) The IDD receives the START UNIT command, then the IDD activates the spindle motor when

the motor start mode is set. When the motor start mode is not set, the IDD terminates this
sequence and enters the command waiting state.

5) The IDD checks that the spindle motor rotation reaches a steady rotational speed.

6) The IDD executes self-configuration. This includes execution of the factory calibration which

is described on the next page and the processing of reading the format information and defect
position information written in the system zone.

7) The disk drive is in ready state and commands from the host system can be executed.

Motor start mode

switch setting

ON

OFF

(7)

(6)

(5)

(4)

ON

OFF

(3)

(2)

(1)

Power-on

Self-diagnosis 1
• MPU bus test
• Internal register
write/read test
• Work RAM write/read
test

Start

Activate spindle motor

Self-diagnosis 2
• Data buffer write/read
test

Motor start mode

switch setting

Check spindle motor

steady state rotation

Execute self-calibration

Drive ready state

(command waiting state)

End

Figure 8.2

IDD operation sequence at power-on

Advertising
This manual is related to the following products: