Step 7, connect electrical, Step 8, install duct cover and utensil rods, Warning – GE Monogram ZV755 User Manual

Page 17

Advertising
background image

17

Installation Instructions

INSTALLATION – RECIRCULATING

CONNECT ELECTRICAL

Verify that power is turned off at the source.

WARNING:

If house wiring is not 2-wire

with a ground wire, a ground must be provided

by the installer. When house wiring is aluminum,

be sure to use U.L. approved antioxidant compound

and aluminum-to-copper connectors.

Remove the junction box cover and the selected

knockout.

Secure the house wiring to the junction box with

a strain relief.

Connect the white lead to the branch circuit white lead.
Connect the black lead to the branch circuit black lead.
Connect the green/yellow lead to the branch

circuit green lead or bare ground lead.

Secure all the connections with wire nuts on each

electrical connector.

Push the wires into the junction box and replace

the cover. Be sure the wires are not pinched.

Secure the junction box cover with the 2 original

screws.

7

INSTALL DUCT COVERS AND

UTENSIL RODS

Assemble the duct covers as shown.

For this recirculating installation, the vent holes must

be positioned at the top. The vent holes must be fully

exposed to allow airflow into the room.

Insert the duct cover assembly into the impressions

on the top of the hood.

• Extend the inner duct cover upwards to meet the

ceiling and support frame.

Install optional accessory ZX7510SPSS

(if needed to reach taller ceiling heights)
Separate the supplied duct cover. Discard the lower

(outer) section.

Slide the new ZX7510SPSS duct cover into the original

upper section. Be sure that the vent holes are

positioned toward the top.

Insert the duct cover assembly into the impressions

on the top of the hood.

Secure the duct cover at the top to the air deflector

with 2 screws provided.

Install the side utensil rods as shown with screws

provided.

8

Junction

box cover

Knockout

Mounting screw holes

Advertising