Installation instructions, Installation – vented to the outside, Step 1, install framing for hood support – GE Monogram ZV755 User Manual

Page 9: Important, Install framing for hood support, Ductwork, wiring locations

Advertising
background image

9

INSTALL FRAMING FOR

HOOD SUPPORT

IMPORTANT

The vent hood must be

secured to rear support framing or a wall stud.

Framing must be capable of supporting 100 lbs.

If drywall is present, mark the screw hole locations

for the top mounting brackets. Remove the template.
Cut away enough drywall to expose 2 vertical studs

at the bracket location indicated on the template.

Install a horizontal support at least 1″ x 12″

between two wall studs at the mounting screw

location. The horizontal support must be flush with

the room side of the studs. Use cleats behind both

sides of the support to secure to wall studs.

IMPORTANT: Reinstall drywall for an even mounting

surface.

1

Installation Instructions

View from

rear cleats

1″ x 12″ min.

mounting

support

DUCTWORK, WIRING LOCATIONS

Determine the exact location of the vent hood.

Locate the template packed with the literature.

– Measure 36″ from the floor to the top of the

cooking surface. Add hood installation height

determined on page 8. Mark that location.

Use a level to draw a straight pencil line on the wall.

– Tape the template in position along the penciled

line. CHECK TO BE SURE THE TEMPLATE IS LEVEL.

Ceiling ducting:
If ductwork will vent straight up to the ceiling:

Use a level to draw a line straight up, from

the centerline on the template to the ceiling.

Measure 3-3/4″ from the back wall to the centerline

of an 6-1/2″ hole on the ceiling.

NOTE: If drywall is not present, add drywall thickness

to the 3-3/4″ dimension.

Wall Ducting:
If ductwork will vent to the rear:

Use a level to draw a line straight up from the

centerline on the template.

Measure at least 6″ above the bracket location shown

on the template to the centerline of a 6-1/2″-dia. duct

hole. (Hole may be elongated for duct elbow.)

HOUSE WIRING LOCATION:

The junction box is located on the top left side

of the hood.

Wiring can enter from the back wall or ceiling above

the top bracket location. Route additional wiring

length to reach the junction box.

INSTALLATION – VENTED TO THE OUTSIDE

6-1/2″ min. opening for ductwork

• Drill 1/8" Pilot Holes For Mounting Brackets.

Align edge 25-1/2" above Cooking Surface.

17-5/16"

3-15/16"

13-9/16"

2-5/32"

C

L

• Drill 1/8" Pilot Holes.

• Drill 1/8" Pilot Holes.

5-7/8"

FOR WALL

VENT DUCT

Centerline 6″ min. above

bracket location

FOR CEILING VENT DUCTING

3-3/4″ c enterline to wall

Centerline of

installation

space

NOTE: 2 horizontal supports

will be needed if there is a

stud located between the

horizontal screw locations.

Advertising