Remove the packaging, Check installation hardware, Installation preparation – GE Monogram ZV755 User Manual

Page 7: Caution

Advertising
background image

CHECK INSTALLATION HARDWARE

Locate the hardware accessory box packed with

the hood and check contents.

3 charcoal filters

Air deflector with upper

duct connector

• Drill 1/8" Pilot Holes For Mounting Brackets.

Align edge 25-1/2" above Cooking Surface.

17-5/16"

3-15/16"

13-9/16"

2-5/32"

C

L

• Drill 1/8" Pilot Holes.

• Drill 1/8" Pilot Holes.

5-7/8"

Wall-mount template

10 wood

screws

10 metal wall

fasteners

2 Large

flat washers

2 Mounting brackets

3 Stainless

steel grease

filters

Decorative

duct covers

Duct cover bracket (not required

for recirculating operation)

2 Phillips-head

duct cover

screws

2 Utensil rods with 4 machine screws

Additional Parts for Recirculation Operation

7

Installation Preparation

REMOVE THE PACKAGING

CAUTION:

Wear gloves to protect

against sharp edges.
The vent hood is shipped secured to a shipping

board with 4 screws.

Remove the duct cover, parts box and styrofoam

packaging.

• Lift the hood out of the box.
• Remove and properly discard the plastic wrapping.
Remove metal grease filters and side bar packaging.

To remove the shipping board, locate and remove

2 screws at the top of the assembly and 2 screws

inside the hood behind the filter guides on the left

and right sides. Discard the shipping board.

Remove junction box cover.
Remove knockout from junction box.
Install strain relief onto junction box.

Mounting screw

Shipping board

Shipping board

Mounting screw

Mounting screw

Knockout

Junction box

NOTE: Additional tools, materials and hardware are

required to construct your wall framing support.

Advertising