Step 4: connect devices to the sub- network, Step 4: connect devices to the sub-network –9 – GE P485 User Manual

Page 65

Advertising
background image

APPLICATION EXAMPLE

P485 MODBUS TO PROFIBUS CONVERTER – USER GUIDE

9–9

STEP 4: CONNECT

DEVICES TO THE SUB-

NETWORK

The fourth step in the configuration wizard is to connect the configured device types to the
sub-network. The PQMII and MM2 devices are connected in this step.

1.

Click Next to proceed to create nodes on Modbus network as shown below.

Figure 9-11: Connect devices to sub-network

2.

There are two nodes on the Modbus network: the PQMII meter and the MM2 relay. To
insert a node, click the Create Node button.

3.

Set the Node Name as “PQMII Meter”, the Slave Address to “20”, and the Device Type
to “PQMII”.

Figure 9-12: Node for PQMII meter

4.

Similarly create another node for the MM2. Set the Node Name as “MMII Relay”, the
Slave Address to “4”, and the Device Type as “MM2-MM3”.

Figure 9-13: Node for MM2 relay

5.

Click Next to proceed to step 5 of the configuration wizard.

Advertising