Prepare the opening, 1tools you will need, Materials you may need – GE JCB968 User Manual

Page 37: Parts included

Advertising
background image

PREPARE THE OPENING

See illustrations for all rough-in and spacing
dimensions.

The range must be placed with 1/2” minimum
clearance at the back wall and side walls of the
cabinet.

MINIMUM DIMENSIONS BETWEEN COOKTOP,
WALLS AND ABOVE THE COOKTOP:

**

* Make sure the wall covering, countertop and

cabinets around the range can withstand the
heat (up to 200°F) generated by the range.

*

** Allow 30” minimum clearance between

surface units and bottom of unprotected
wood or metal cabinet, and 15” minimum
between countertop and adjacent cabinet
bottom.

*** Recommended spacing to heat-sensitive

surfaces.

1

TOOLS YOU WILL NEED

37

Installation Instructions

PREPARE TO INSTALL THE RANGE

MATERIALS YOU MAY NEED

Anchor Sleeves

Lag Bolts

(For Anti-Tip Bracket Mounted

on Concrete Floors Only)

Adjustable Wrench

Level

Phillips Screwdriver

Drill with 1/8” Bit

Pencil

Safety Glasses

Tape Measure

Flat-blade

Screwdriver

PARTS INCLUDED

Anti-Tip Bracket Kit

3”

3”

7

1

2

25”

36”

30”

Acceptable electrical
outlet area.

Orient the electrical
receptacle so the length
is parallel to the floor.

*

1

2

” Min.

**15” Min.

**30” Min.

*

1

2

Min.

***6”

Min.

Advertising
This manual is related to the following products: