Installation instructions – GE JCB968 User Manual

Page 39

Advertising
background image

FINAL INSTALLATION
CHECKLIST

Check to make sure the circuit breaker is

closed (RESET) or the circuit fuses are
replaced.

Be sure power is in service to the building.

Check to be sure that all packing materials

and tape have been removed. This will
include tape on metal panel under control
knobs (if applicable), adhesive tape, wire
ties, cardboard and protective plastic.
Failure to remove these materials could
result in damage to the appliance once the
appliance has been turned on and surfaces
have heated.

Check to make sure that the door and

drawer are parallel to each other and that
both operate smoothly. If they do not, see
the Owner’s Manual for proper replacement.

Check to make sure that the rear leveling leg

is fully inserted into the Anti-Tip bracket and
that the bracket is securely installed.

6

OPERATION CHECKLIST

Turn on one of the surface units to observe

that the element glows within 60 seconds.
Turn the unit off when glow is detected.
If the glow is not detected within the time
limit, recheck the range wiring connections.
If change is required, retest again. If no
change is required, have building wiring
checked for proper connections and voltage.

Check to make sure the Clock (on models

so equipped) display is energized. If a series
of horizontal red lines appear in the display,
disconnect power immediately. Recheck the
range wiring connections. If change is made
to connections, retest again. If no change is
required, have building wiring checked for
proper connections and voltage. It is
recommended that the clock be changed
if the red lines appear.

Be sure all range controls are in the OFF

position before leaving the range.

7

Installation Instructions

39

Advertising
This manual is related to the following products: