Installation instructions, Parts provided, Duct cover requirements – GE JV965 User Manual

Page 12

Advertising
background image

12

Installation Instructions

PARTS PROVIDED

Locate the hardware accessory box packed with the
hood and check contents.

2 Aluminum

Grease Filters

Duct

Transition

with Damper

Filter

Support

Screws, wall

fasteners, washers

DUCT COVER REQUIREMENTS

We recommend that the vent hood and decorative
duct cover (if used) be on site before final framing and
wall finishing. This will help to accurately locate studs,
ductwork and electrical service. Read these instructions
to determine if the duct cover accessory can be used for
your installation situation.

Duct Cover Accessory:

• Use the decorative duct

cover to conceal ductwork
running from the top of
the hood to the ceiling.

• The duct cover accessory

consists of 2 pieces. The
outside piece is 12

″ high,

the inside piece is 22

″.

Nested together they are
24

″ min., expanding to

a total maximum height
of 34

″.

• The outside piece can

be used alone to fill a
12

″ height.

• For heights over 12

″, the

ceiling bracket must be
installed to secure the
cover at the top.

To avoid unsightly gaps, plan the hood installation height
for duct cover use.
• The cover will fit a 12

″ min. height from the top of the

hood to the ceiling,

– or 24

″ min. and expanding up to 34″ from the top of

the hood to the ceiling.

THE DUCT COVER CANNOT BE USED WHEN THE
DISTANCE ABOVE THE TOP OF THE HOOD IS
BETWEEN 12

AND 24.

Review the following examples to ensure a trouble free
installation using the duct cover accessory.

8 ft. Ceilings: The hood must
be installed at 30

″ above the

cooking surface (or 66

″ above

the floor). The duct cover will
not fit if the hood is installed at
a lower or higher height. Use
the outside 12

″ section, discard

the inside section.

8 ft. Ceiling

30"

12"

9 ft. Ceilings: Install the hood 24

″ min. and up to a maximum of 30″

above the cooking surface. The duct cover will expand to reach
ceiling height.

10 ft. Ceilings: Install the hood 32

″ min. to 36″ max. above the cooking

surface. The duct cover will expand to a maximum of 34

″ above the

top of the hood to meet the ceiling.

24"

30"

9 ft. Ceiling

30"

24"

32"

34"

10 ft. Ceiling

36" Max.

30"

12"

12"

12"

11"

22"

2 Control Knobs

Advertising
This manual is related to the following products: