Installation instructions, Caution, 5 install ceiling bracket – GE JV965 User Manual

Page 16: 6 connect ductwork

Advertising
background image

Installation Instructions

16

5 INSTALL CEILING BRACKET

The ceiling bracket must be installed when the duct
cover is used to span 24

″ or more height above the

hood. The bracket will hold the decorative duct cover
in place at the top.
Note:

The ceiling bracket is not required when using

only the 12

″ section of the duct cover.

• Install the 2 small screws into the sides of the duct

bracket. Remove the screws. Pre-tapping the holes
will insure ease of final installation.

• Match center notch on the bracket to the centerline

on the wall and flush against the ceiling.

• Mark the 2 screw hole locations.
• Drill 1/8

″ pilot holes in marked bracket location.

• If pilot holes do not enter studs, enlarge the holes to

3/8

″ and install wall fastener anchors.

• Secure the bracket to the rear wall with wood screws

and washers. Use wall anchors if needed.

6 CONNECT DUCTWORK

• Push duct over the end of the transition until it

reaches the stop tabs.

• Install ductwork, making connections in direction of

airflow as illustrated.

• Secure joints in ductwork with sheetmetal screws.
• Wrap all duct joints with duct tape for an airtight

seal.

• Use duct tape to seal the flange connection.

CAUTION:

Do not use sheet metal

screws at the hood flange connection. Doing so
will prevent proper damper operations. Seal
connection with tape only.

Screw

Duct Tape
Over Seam
and Screw

Duct Tape

Air Flow

Duct Tape

Over Flange

Duct

Stops

Note: Bracket has 2 sets of holes. Use larger holes for wall
fasteners or wood screws with washers. Use smaller holes for
wood screws with washers.

See Step 9

to Install

Duct Cover

Install

Ceiling Bracket

When Duct

Cover is

Used to Span

24" or More

Advertising
This manual is related to the following products: