Installation instructions, 1 install hood support, 2 install transition – GE JV965 User Manual

Page 14: 3 install hood onto wall

Advertising
background image

13-1/16"

1/4"

Gap

Installation Instructions

14

1 INSTALL HOOD SUPPORT

IMPORTANT: Framing must be capable of
supporting 100 lbs.

• Locate at least 2 vertical studs at the wood mounting

location by tapping drywall with a hammer or use a
stud finder.

• Center the supplied wood horizontal support, left to

right and below the marked line.

• Drill 1/8

″ pilot holes through the support, drywall

and into the studs. Secure the support to 2 or more
vertical studs with supplied wood screws.

IMPORTANT:

Screws must penetrate at least 1-1/2

into vertical studs. Countersink screws into support.

• Install mounting screws in the center of the wood

support, 13-1/16

″ from the centerline. The screws

should protrude forward 1/4

″. This 1/4″ gap will

provide clearance to hang the hood.

2 INSTALL TRANSITION

• Place the transition piece over the hood exhaust.

Secure transition to hood with 4 screws provided.

• Use duct tape to seal the connection.

3 INSTALL HOOD ONTO WALL

• Lift the hood and place over the wood support.

The top keyhole slots in the hood should engage
the protruding mounting screws. Allow the hood
to slide down into position.

• Pull house wiring through knockout at the rear or

the top of the hood.

• Check to be sure the hood is level and centered. The

arrow shaped cutout in the back of the hood allows
viewing the marked centerline.

• Remove cover from junction box.

Drill Bottom Mounting Hole Locations
• Drill 1/8

″ pilot holes into the two lower mounting

holes. Enlarge the holes if they did not enter studs to
3/8

″. Tap anchors for wall fasteners into bottom holes.

–Install screws by hand into the fasteners to allow

anchors to expand against the wall. Remove screws.

• Using two large flat washers (supplied), install wood

screws or wall fastener screws, loosely, into lower
mounting holes. Do not tighten.

• Check hood level. Tighten upper screws. Tighten

lower mounting screws.

• For additional security, drive screws through the

original wood support screw holes in the back of
the hood.

Centerline of
Installation
Space

7" Min. Opening for Ductwork

15-3/8"

24"

to

36"

Wood
Support

Duct

Transition

Top of

Hood

Remove

Shipping

Tape on
Damper

Centerline of
Installation
Space

24"

to

36"

Cutout

IMPORTANT: Remove
shipping tape from
damper and check that
damper moves freely.

Advertising
This manual is related to the following products: