Maytag W10445417B User Manual

Page 17

Advertising
background image

17

1.

Prepare your 3-wire cable

for direct connection

1"

(25 mm)

3½"

(89 mm)

2.

Remove center screw

B

Use where local codes permit connecting cabinet-ground

conductor to neutral wire.

Remove center terminal block screw (B).

Direct wire cable must have 5 ft. (1.52 m) of extra length so

dryer may be moved if needed.
Strip 3

1

/

2

" (89 mm) of outer covering from end of cable. Strip

insulation back 1" (25 mm). If using 3-wire cable with ground

wire, cut bare wire even with outer covering. Shape wire ends

into hooks.

3.

Connect neutral wire

D

B

Place hooked end of neutral wire (white

or center) (D) of direct wire cable under

center terminal block screw (B), hook

facing right. Squeeze hooked end together.

Tighten screw.

3-Wire Direct Wire Connection

4.

Connect remaining wires

Place hooked ends of remaining direct wire cable wires under

outer terminal block screws (hooks facing right). Squeeze hooked

ends together and tighten screws. Replace the terminal block

cover on the back of the dryer. Tighten strain relief nut. Now,

go to“ Venting Requirements.”

Advertising
This manual is related to the following products: