Manitowoc Ice Q User Manual

Page 25

Advertising
background image

Section 2

Installation Instructions

Part Number 000001530

2-15

Step 4 Connecting the line set.

To prevent oxidation of the copper, purge line set and
condensing unit with dry nitrogen while brazing.

Connect The Line Set To The Ice Machine Head
Section

The line set can be routed for entry through the top or
rear of the ice machine head section.

Top routing requires the cover to be trimmed.

Rear routing requires the use of the supplies 90°
elbows.

Nitrogen purge is recommended while brazing the line
set to the ice machine head section. The line set shut off
valves at the back of the ice machine must remain
closed and be protected from heat during the brazing
process. Wrap the valves in a wet rag or other type of
heat sink prior to brazing. Cool braze joint with water
immediately after brazing to prevent heat migration to
the valve.

Connect The Line Set To The CVD Condensing Unit

The compressor oil rapidly absorbs moisture. Be
prepared
to complete line set installation and start your
evacuation process in order to minimize the time the
compressor is exposed to the atmosphere. (Maximum
amount of time the system can be exposed to the
atmosphere is 15 minutes).

The line set can be routed for entry through the rear or
left side of the condensing unit.

Remove knockout for preferred location.

Insert supplied plastic bushings in knockout holes to
prevent tubing from contacting sheet metal.

Use the supplied 90° elbows to route tubing.

Cut the tubing ends of the suction and liquid lines
and braze the line sets to the condensing unit.

!

Warning

The ice machine head section contains refrigerant
charge. The ice machine head section contains three
(3) refrigeration valves that must remain closed until
proper installation of the line sets is completed.

!

Warning

The condensing unit ships from the factory
pressurized with a 50/50 mixture of nitrogen/helium.
Bleed off pressure from both suction and liquid line
access ports prior to cutting into refrigeration lines.

VALVES MUST REMAIN

CLOSED AND BE

PROTECTED FROM

HEAT WHEN BRAZING

(WRAP WITH WET RAG)

SV1757

!

Warning

The condensing unit ships from the factory
pressurized with a 50/50 mixture of nitrogen/helium.
Bleed off pressure from both suction and liquid line
access ports prior to cutting into refrigeration lines.

PT1306A

MINIMIZE THE TIME THE REFRIGERATION

SYSTEM IS EXPOSED TO THE ATMOSPHERE

(15 MINUTES MAXIMUM)

SUCTION

LINE

LIQUID

LINE

Advertising