Sequence of piercing operation, Consumables storage compartment, 7. sequence of piercing operation – Miller Electric ICE-100T User Manual

Page 27: 8. consumables storage compartment

Advertising
background image

.

A complete Parts List is available at www.MillerWelds.com

OM-201 872 Page 23

Ref. 803 640-A / 801 400-B

5-7. Sequence Of Piercing Operation

Maintain approximately 90

°

torch

position to surface, and continue

cutting.

Release trigger. Postflow continues for

approx. 20 seconds after releasing trigger;

arc can be instantly restarted during postflow

by raising trigger lock and pressing trigger.

The pilot arc starts immediately
when trigger is pressed.

Hold torch at an

angle to the

workpiece. Raise trigger lock and

press trigger. Pilot arc starts.

Connect work clamp to a

clean, paint-free location

on workpiece, as close to

cutting area as possible.

.

Set air pressure to 75 PSI
(517 kPa) for cutting.

90

°

90

°

Rotate torch to upright position

approximately 90

°

to surface.

When arc has pierced through

workpiece, start cutting.

Set Mode switch to CUT.

5-8.

Consumables Storage Compartment

804 026-A

Rear of Unit

1

1

Consumables Storage
Compartment

This compartment provides
convenient access to consumables
and parts.

Advertising
This manual is related to the following products: