IBM 2274 User Manual

Page 105

Advertising
background image

Check Procedures 71

007 - DO YOU HAVE AN OHM READING WHEN
THE SWITCH IS PRESSED AND AN OPEN
READING WHEN THE SWITCH IS RELEASED?
(YES, READ AHEAD. NO, GO TO STEP 008.)

Replace the on/off switch cable assembly.

008 -

Replace the system board.

End.

009 -

Replace the power supply.

End.

Advertising