Sanyo ECO R410A User Manual

Page 26

Advertising
background image

26

5. Flare Insulation of Tubing

After completing a leakage test, apply heat insulation. (Fig. 3-55)

* Use the flare insulator provided with the product.

6. Securing the External Electronic Expansion Valve After Connection with Tubing

After connection with tubing, secure the external electronic expansion valve using the supplied clamps (large) to

hold it against the gas tube. (Fig. 3-56)

* Be careful not to tighten the clamps with excessive force in order to avoid deforming the tubing or other parts.

Outdoor side

Indoor side

Clamps (small)

Clamps (small)

Flare insulator

Insulating tape

Flare insulator

Insulating tape

Be careful not to allow a gap to
occur between the thermal
insulation of the tubing and the
thermal insulation of the main unit.

Fig. 3-55

Clamp (large)

Gas tube

Clamp (large)

Liquid tube

Fig. 3-56

Advertising