General – Sanyo ECO R410A User Manual

Page 5

Advertising
background image

5

1-2. Accessories Supplied

See Tables 1-1 – 1-4.

1-1. Tools Required for Installation (not supplied)

1. Flathead screwdriver

2. Phillips head screwdriver

3. Knife or wire stripper

4. Tape measure

5. Carpenter’s level

6. Sabre saw or key hole saw

7. Hacksaw

8. Core bits

9. Hammer

10. Drill

11. Tube cutter

12. Tube flaring tool

13. Torque wrench

14. Adjustable wrench

15. Reamer (for deburring)

1-3. Type of Copper Tube and Insulation Material

If you wish to purchase these materials separately from a

local source, you will need:

1. Deoxidized annealed copper tube for refrigerant tubing.

2. Foamed polyethylene insulation for copper tubes as

required to precise length of tubing. Wall thickness of the

insulation should be not less than 5/16 in.

3. Use insulated copper wire for field wiring. Wire size varies

with the total length of wiring.

Refer to “4. ELECTRICAL WIRING” for details.

1-4. Additional Materials Required for Installation

1. Refrigeration (armored) tape

2. Insulated staples or clamps for connecting wire

(See your local codes.)

3. Putty

4. Refrigeration tubing lubricant

5. Clamps or saddles to secure refrigerant tubing

6. Scale for weighing

CAUTION

Check local electrical codes and

regulations before obtaining

wire. Also, check any specified

instructions or limitations.

1. GENERAL

This booklet briefly outlines where and how to install the air conditioning system. Please read over the entire set of instructions for

the outdoor unit and make sure all accessory parts listed are with the system before beginning.

Advertising