Superior SLBV-40PM User Manual

Page 23

Advertising
background image

Step 12. Install Hood

NOTE: All models must have a hood installed

prior to operating.

Refer to Figure 30. Install hood by sliding it into

the slots on the lower edge of the cabinet top.

Step 13. finishing Requirements

Wall details

Complete finished interior wall.

To install the appliance facing flush with the

finished wall, position framework to accom-

modate the thickness of the finished wall

(Figure 30).

For Cold Climate Insulation, see Page 5.
For Clearances, see Page 7.

Top of Appliance

1 in (25 mm) min.

Figure 30: Combustible Wall Framing

Combustible finished

Wall Materials

Combustible material

may touch appliance top.

Hood

3" Clearance min.

IMPORTANT!

Bend up standoffs

to vertical position.

Header

SUPERIOR

®

B-VENT GAS FIREPLACES • MODELS SLBV-35, SLBV-40 • INSTALLATION INSTRUCTIONS

23

NOTE: DIAGRAMS & ILLUSTRATIONS ARE NOT TO SCALE.

Advertising
This manual is related to the following products: