Ssembly and, Etup, Unpacking – Star Trac FITNESS S-TR User Manual

Page 19: Tools, Required, Assembly

Advertising
background image

STAR

TRAC

S

SERIES

TREADMILLS

O

WNER

S

M

ANUAL

19

A

SSEMBLY AND

S

ETUP

Use the following procedures to unpack and assemble your STAR TRAC S SERIES TREADMILL. Assembly procedures
are the same for all S SERIES TREADMILLS.

UNPACKING

Open the shipping carton, remove all parts from the carton and foam inserts, and verify that the following parts are included
in your shipment:

Description

Qty

Base Assembly

1

Neck (and Shroud)

1

Neck Shroud

1

Display Console Assembly

1

Handrail

2

Bolt, Allen Head, M10 X 20

8

Description

Qty

Lockwasher, D=10

8

Hex Nuts*

4

Bolt, Allen Head, M6 X 50

4

Screw, Hex Head, M10 X 140**

4

Bolt, Allen Head, M6 X 25

2

Lockwasher, D=6

4

*Used for shipping only.

**Pre-installed on base assembly.

TOOLS

REQUIRED

Most STAR TRAC treadmills can be assembled using the following tools:

Metric Hex Key Wrenches

Metric Open-End Wrenches

Metric Ratchet Socket Wrench Set

Torque Wrench

Channel Lock Pliers

Vice Grip Pliers

Rubber Mallet

Phillips Head Screwdriver

Your STAR TRAC S SERIES TREADMILL includes a hex key set and combination open-end wrench.

ASSEMBLY

1. Unpack and Position the Base Assembly

CAUTION:

The motor end of the base assembly is very heavy. Two people may be needed to lift this end when moving

the base assembly.

Remove all packaging material so the base assembly is sitting on the shipping crate platform. With a helper, lift the

base assembly from the shipping crate platform, and place it in the location where it will be used. Be sure the
selected location is level, and close to a power outlet.



3. Install the Display Console

Advertising
This manual is related to the following products: