Other general operations, Changing the meter peak hold and the counter mode, Editing the project/file name – KORG MR-1 User Manual

Page 24: P.24), Ding

Advertising
background image

24

8. Other general operations

Changing the meter peak hold and the counter mode

1. From the level meter screen, press the P-dial.

The meter/counter (Meter/Counter) screen will appear.

2. Use the P-dial to select and confirm "Meter Peak Hold" (peak indicator hold time).

A check mark will appear in the hold time check box you selected (0 seconds, 4 seconds, 10
seconds).

3. Use the P-dial to select and confirm "Counter Mode" (counter display mode).

A check mark will appear in the mode check box you selected.

ABS:

The location is shown as an absolute time, with 0 (zero) as the point at which record-

ing began for the file.

Free:

The remaining recordable time is displayed, as calculated from the current file for-

mat (

→p.36) and the amount of space remaining on the hard disk.

Push

Push

4. When you've finished making settings, press the menu button to return to the level

meter screen.
You can also confirm and return by using the P-dial to select and confirm "<-Back" in the
screen.

Editing the project/file name

You can specify a name of up to sixteen characters, using uppercase alphabetical characters A-
-Z, lowercase alphabetical characters a--z, numerals 0--9, and the following symbols.

! # $ % & ' ( ) + , - ; = [ ] ^ _ ` { } ~

You can't edit the name of a project that's protected.

1. Press the menu button, and in the menu list (MENU) screen, use the P-dial to select

and confirm "LIBRARY."
The library select (LIBRARY) screen will appear.

MR1_Text2_E.p65

06.11.22, 0:00 PM

24

Advertising