Removing the operator information panel assembly, Removing, Installing – Lenovo RD210 User Manual

Page 125: Operator, Information, Panel, Assembly

Advertising
background image

3.

Reinstall

the

screws

on

the

video

connector

3 .

4.

Reinstall

the

hard

disk

drives

and

drive

bay

filler

panels

into

the

drive

bays.

5.

Install

the

cover

(see

“Removing

and

replacing

the

cover”

on

page

43).

6.

Reconnect

the

power

cords

and

any

cables

that

you

removed.

7.

Slide

the

server

into

the

rack.

8.

Turn

on

the

peripheral

devices

and

the

server.

Removing

and

installing

the

operator

information

panel

assembly

To

remove

and

install

the

operator

information

panel,

complete

the

steps

in

this

section.

Removing

the

operator

information

panel

assembly

To

remove

the

operator

information

panel,

complete

the

following

steps.

1.

Read

the

safety

information

in

“Safety”

on

page

vii

and

“Installation

guidelines”

on

page

39.

2.

Turn

off

the

server

and

peripheral

devices

and

disconnect

all

power

cords.

3.

Remove

the

cover

(see

“Removing

and

replacing

the

cover”

on

page

43).

4.

Disconnect

the

cable

from

the

back

of

the

operator

information

panel

1

assembly.

5.

Use

an

object

to

push

down

on

the

release

tab;

hold

down

the

release

tab

2

and

push

the

blue

push

point

on

the

rear

of

the

panel

to

the

front

of

the

server.

Chapter

5.

Installing

optional

devices

and

replacing

customer

replaceable

units

109

Advertising
This manual is related to the following products: