Lenovo 1047 User Manual

Page 62

Advertising
background image

the fast charge cycle will terminate prematurely, thus preventing the battery card assembly from
reaching a fully charged state.

Attention:

• When attaching the battery card assembly to a PCI Express slot, center the Phillips-head screw

driver to avoid damaging the screw head and do not over-tighten the screws as you might damage
the battery card assembly.

• The battery in the battery card assembly must recharge for at least six hours during fast charge

under normal operating conditions.

To install the battery card assembly onto the RAID controller, do the following:

a. Note the top view and bottom view of the battery card assembly. Then, insert the battery pack

harness connector into the J4 battery pack harness connector on the backside of the battery card
assembly. For more information, refer to the following illustrations.

Figure 40. Top view of the battery card assembly

1

Battery pack harness

Figure 41. Bottom view of the battery card assembly

1

J4 battery pack harness connector

2

J5 board-to-board connector

3

J2 connector

b. With the front side up, place the RAID controller on a flat, clean, static-free surface.

50

ThinkServer User Guide

Advertising
This manual is related to the following products: