1 unit installation checklist, Unit installation checklist – Liebert Rack Enclosure With Integrated Water-Based Cooling XDK User Manual

Page 25

Advertising
background image

Water Purity Requirements

21

8.1

Unit Installation Checklist

___ 1. Check unit for damage on delivery
___ 2. Check for level floor
___ 3. Check maximum floor load
___ 4. XDK feet adjusted, if applicable
___ 5. XDK is level
___ 6. No remains of packaging in the XDK
___ 7. All installation tools removed
___ 8. Cable entries into the unit correct and air-tight
___ 9. Cable connections checked
___ 10. Cold water connection does not leak
___ 11. Pressure test performed
___ 12. Water circuit bled
___ 13. Water flow rate adjusted
___ 14. Condensed water pipe clear
___ 15. Water system odor trap in order
___ 16. Heat exchanger tray connected to condensed water pipe
___ 17. Fan function checked
___ 18. All front panels closed (separation of air flows)
Comments

Signature

Date

Checker