Paradyne Hotwire ATM Line Cards 8385 User Manual

Page 102

Advertising
background image

5. Diagnostics

5-16

February 2003

8335-A2-GB20-70

2. Select an interface (dsl1:1 through dsl24:1 on the Model 8385).

3. Enter the unit to be tested in the SHDSL network segment (STU-C, STU-R, or

SRU1– SRU-8). Use the unit identifiers defined in

Figure 5-1, SHDSL Data

Path

.

4. Enter the side of the selected unit to be tested (Customer or Network) as

shown in

Figure 5-1, SHDSL Data Path

.

5. Enter the duration of the test (1–10 minutes).

6. Enter Start to start the test. A loopback begins on the selected unit in addition

to a 511 BERT on the STU-C at the same time. The test continues to run until
you enter Stop or the selected duration has expired.

7. Enter Stop if you want to end the test before the duration has expired.

8. Interpret the display as shown in

Table 5-5, Diagnostics – Loopback Test

.

Figure 5-1.

SHDSL Data Path

CPE

STU-R

SRU

SRU

STU-C

NS

CS

SHDSL Span

Application

Specific

SHDSL

Segment

SHDSL

Segment

SHDSL

Segment

Application

Specific

01-17042

User Data Path

PTD

CPE = Customer Premises Equipment
CS = Customer

Side

NS

= Network Side

PTD = Path Terminating Device
SRU = Signal Regeneration Units
STU-R = SHDSL Transceiver (Remote Terminal Site)
STU-C = SHDSL Transceiver (Centeral Site)

NS

CS

NS

CS

Advertising
This manual is related to the following products: