Planning the installation
22
Model 2292 & 2294 Series Getting Started Guide
3 • Hardware installation
Planning the installation
Before you start the actual installation, it is strongly recommended that you gather all the information needed
to install and setup the device. See
for an example of what pre-installment checks you might need to
carry out. Having carried out the pre-installation checks enables you to install and set up your SmartNode
extender into an existing infrastructure with confidence.
Note
When setting up your SmartNode extender consider cable length limita-
tions, and potential electromagnetic interference (EMI) as defined by the
applicable local and international regulations. Ensure that your site is prop-
erly prepared before beginning installation.
Before installing the SmartNode extender device, the following tasks should be completed:
•
Create a network diagram (see section
•
Gather IP related information (see section
on page 24 for more information)
•
Install the hardware and software needed to configure the SmartNode. (See section
•
Verify power source reliability (see section
When you finish preparing for SmartNode extender installation, go to section
on page 25 to install the device.
The mains outlet that is utilized to power the equipment must be
within 1 foot (0.3048 meters) of the device and shall be easily
accessible.