Required Materials Provided by Customer

Required hardware

†

Rack

The shelves are designed to fit into a 19” mounting rack.

Each shelf measures 15” high x 19” wide x 9” deep, and weighs
approximately 35 pounds fully loaded.

†

Backboard space

As an alternative to rack mounting, the shelves

can be wall-mounted to 3/4” plywood securely screwed to a wall.

†

Screws

Required to mount the shelves to the wall, or to secure it

in the rack. For wall mount, six #10-5/8” panhead wood screws
(or similar device) are required. For rack mount, screws required
are determined by the rack requirements; typically 10-32 or 1/4-
20. For multi-shelf systems, four 1.75” #8 panhead wood screws
are required to secure the Intershelf Junction Panel to the
backboard, along with standoffs at least 1.5” long with 1/4” inside
diameter.

†

Power and Conduit

-48V Power Source and conduit for connection,

either 1/2” BX metallic or NMX conduit. Three #8 insulated rings
for use with #14 AWG wire are required for each MCS300 to be
installed.

†

25 Pair Cables

RJ-21 male at MCU end, required to connect the

shelves to the cross-connect blocks.

†

Cross-Connect Blocks

Required to connect the PBX ports and the

Base Stations to the MCU.

†

Quick Clip Fuse

Required with an RCO-400 Outdoor Base Station

or when a Base Station is located in a separate building from the
SpectraLink 6300 MCU. Recommended Quick Clip Fuse is
available from Reliable Electric, Model # RSCP-2.

†

Ladder

Polycom installation crew will require a ladder to reach

the Base Station locations. Ensure that a ladder of adequate height
is available for the crew’s exclusive use upon arrival.