Installation forms, Site preparation checklist – Polycom SpectraLink 6300 MCU User Manual

Page 43

Advertising
background image

PN: 1725-36121-001_J.doc

43

Installation Forms

This section contains the following forms:

Site Preparation Checklist

Base Station Locations Worksheet

Extension Assignments Worksheet

Copy these forms as needed. Be sure to maintain completed forms for
future reference.

Site Preparation Checklist

If upon arrival the Polycom field service engineer determines that the
pre-installation work has not been completed correctly, the engineer
has two options: 1) The engineer can leave the site and reschedule the
installation when the action items have been completed or corrected,
or 2) The engineer can assist in preparing the site, and thus spend
additional time in the installation of the system.
Because of the additional cost incurred by Polycom in executing either
option, the customer will be billed for the additional time at our
standard hourly rate plus expenses.
Please review this manual and make sure the following items are
completed:

†

MCU location prepared. Typically the MCU is installed in the
telephone equipment. This location must have sufficient rack
backboard space and power available. See Chapter 3 section
Prepare Power for Shelves for further details.

†

Two-pair wires are run to each of the Base Station locations as
designated on the building floor plans. Use Level 3 cable for
lengths up to 3,500 feet; Level 4 for lengths up to 6,000 feet.

†

The Base Station cables are terminated with RJ-45 crimp-on plugs
at the designated locations. See Chapter 3 section Prepare Demarc
Blocks
.

7

Advertising