Mount base stations on finished ceilings – Polycom SpectraLink 6300 MCU User Manual

Page 38

Advertising
background image

Facility Preparation: SpectraLink 6000 System: SpectraLink 6300 MCU

PN: 1725-36121-001_J.doc

38

4. When properly attached the Base Station should sit almost flush

against the ceiling and be tightly attached to the clip and T-bar
grid work.

5. Once the Base Station is anchored to the fastener, lift the acoustical

tile and plug the RJ-45 8-pin modular plug into the connector on
the top of the Base Station.

The LED will blink red and green as the system software
downloads to the Base Station and the Base Station is tested.

When the LED blinks amber, the system is ready for operation.

When the LED blinks green, a handset has established a radio
link with that Base Station.

If the LED turns solid red or other red/green sequence, refer
to SpectraLink 6300 MCU: Maintenance and Diagnostics.

Mount Base Stations on Finished Ceilings

If this site does not have a dropped tile ceiling, the Base Station can be
mounted to a finished ceiling or wall with a 4 to 5” long 1/4” -20 TPI
plastic or nylon screw or bolt (such as a lag screw).

1. Drill two holes approximately 1” apart. Make the holes large

enough to accommodate the RJ-45 connector and a bolt to secure
the Base Station.

2. Insert a wide washer above the ceiling, then screw the bolt into

the beam or ceiling.

3. Insert three nuts on the bolt, then screw the Base Station into the

bolt, being careful not to insert the bolt more than 1/3”, five full
turns, into the Base Station.

If the ceiling is open with I-beams or pipe construction, mount the
Base Station with I-beam clamps or pipe clamps.

The customer's wire contractor is responsible for this installation.