Installation overview – Polycom SpectraLink 6300 MCU User Manual

Page 7

Advertising
background image

PN: 1725-36121-001_J.doc

7

Installation Overview

Installation has three phases. In most cases, a separate person is
responsible for each phase.
1. Site preparation and wire installation: Usually done by a wire

technician or contractor, with the assistance of a customer
representative such as a project manager. Please refer to the
SpectraLink 6300 MCU: Facility Preparation manual for more
information.

2. Installing the SpectraLink system: Done by Polycom or one of our

certified distributors.

3. Programming the customer's telephone system to work with the

SpectraLink system: Usually done by the customer’s system
administrator or technician. Please refer to the LinkPlus Interface
Guide
for instructions on programming the telephone system at
the local site.

Because these major steps require some parallel activities, it is
important to coordinate the activities among the persons involved.
The following table lists the installation steps and the person typically
responsible for each step.