Facility Preparation: SpectraLink 6000 System: SpectraLink 6300 MCU

PN: 1725-36121-001_J.doc

22

Wall mounting

Before wall mounting, cover the wall with 3/4” plywood. Secure the
plywood to the wall studs every 16” with an adequate number of
screws to support the number of shelves to be mounted. Each fully
loaded shelf weighs approximately 35 pounds. Be sure to leave 1.5”
clearance on the left side for power conduit.
Using the following drawing as a guide, drill six pilot holes using a
1/8” drill bit.
Insert the six screws (#10 panhead wood screws, 5/8” long) into the
pilot holes and tighten them, leaving approximately 1/8 to 1/4” gap
from the wall.

Wall Mounting Dimensions

Prepare Power for Shelves

The SpectraLink 6300 MCU requires a -48V DC power source. The -
48V connection is comprised of three wires: -48, +48 (neutral), and
ground.