Facility Preparation: SpectraLink 6000 System: SpectraLink 6300 MCU

PN: 1725-36121-001_J.doc

20

unlimited access to the Customer Support Hotline for additional
assistance.

Union labor

In some areas strict labor union rules will preclude the SpectraLink
representative’s ability to install the equipment without union
assistance. If such rules are in force in the local area, the customer
must ensure that sufficient union help is available at the scheduled
installation time to carry out the following functions:

Install Base Stations

Move and reinstall Base Stations

Make cabling changes at cross-connect blocks

Run cables

Make and modify electrical connections

Prepare Location for Shelves

The MCU, composed of up to 20 shelves and one Intershelf Junction
Panel, is usually installed in or near the telephone equipment room. If
this is not possible, the MCU can be located anywhere that the
telephone system lines are accessible.
The number and arrangement of the system shelves depends on the
size and configuration of the system.

System Controller

Part Number

Shelves

Supported

Base Stations

Supported

Users

Supported

CSC301/ CSO301

1

60

160

CSC306/ CSO306

6

360

960

CSC320/ CSO320

20

1,000

3,200

Consideration should be given to:

Environmental conditions. The system outputs 28 BTUs per hour,
per interface module.

Space for the backboard or rack

Space for the shelves, which are designed for 19” rack or wall
mounting.

Each shelf measures 15” high x 19” wide x 9” deep, and weighs
approximately 35 pounds fully loaded.