INSTALLATION

EATON Powerware

®

9125 Two-in-One UPS (2500/3000 VA) User’s Guide

S 164201374 Rev D

www.powerware.com

26

4.

For 208/230V models only. Plug the detachable UPS power cord into
the input connector on the UPS rear panel.

5.

Plug the UPS power cord into a power outlet.

All front panel indicators flash briefly and the UPS conducts a
self-test. When the self-test is complete, the

μ

indicator flashes,

indicating the UPS is in Standby mode with the equipment offline. If
the

or

indicator flashes, see page 65.

Site Wiring Fault
Indicator

Battery Service
Indicator

Figure 19. Fault Indicators

6.

Press the On

button.

The

μ

indicator illuminates solid and the bar graph indicators

display the percentage of load being applied to the UPS. The UPS is
now in Normal mode and supplying power to your equipment.

To change the factory-set defaults, see “Configuration” on page 41.

NOTE The batteries charge to 90% capacity in approximately 3 hours. However, it is
recommended that the batteries charge for 24 hours after installation or long-term storage.