Gs inspection check list – Nortec Industries GS Series User Manual

Page 29

Advertising
background image

- 25 -

GS INSPECTION CHECK LIST

HUMIDIFIER MOUNTING

£

Verify proper clearances around the unit

£

Humidifier mounted level

£

Humidifier properly secured to stand and stand bolted to floor

£

All service doors accessible

£

Roof curb sized correctly (Outdoor Model Only)

GAS PIPING

£

Correct gas line size installed

£

Certified manual shut off valve and union installed

£

Sediment trap installed

£

Gas piping leak tested

£

Air purged from lines

£

Proper gas supply pressure

£

Regulator dedicated for each gas unit

EXHAUST GAS VENTING

£

Comply with local regulations

£

Proper venting materials used (B or BH) – refer to gas codes

£

Maximum vent length of 100 feet (70 feet for direct vent models)

£

Proper pipe diameter used

£

Condensate tee installed

STEAM LINES

£

Slope up 2” per 12”

£

Sloped back to drain

£

Slope down ½” per 12”

£

Trapped 2” more than static duct pressure

£

Traps

Size

_______

£

Insulated

£

Length/Size

____________

£

90 deg. Elbows qty:

____

£

45 deg. Elbows qty:

____

£

Can condensate be trapped anywhere in the steam line? yes

£

no

£

CONDENSATE LINES

£

Sloped back to drain

£

Trap is greater than 2” duct static pressure

£

Size of trap

_______

Advertising