Nortel Networks SRG50 User Manual

Page 25

Advertising
background image

Chapter 2 SRG50 overview

25

SRG50 Configuration Guide

The figure

Process map for installing and configuring an SRG

on page 26 provides a process map

for installing and configuring an SRG50. The procedures in this document assume that the
following activities have been completed:

•

The BCM50, including media bay modules, cabling, telephones, and peripherals, have
been installed.

•

BCM50 administration has been set up.

•

The basic parameters of the BCM50 have been configured.

•

CS1000 main office system has been installed and configured to support SRG.

•

The SRG has been connected to the LAN (as required) and WAN (to the main office).

•

System functionality has been tested to this point.

•

Attached devices have been installed and configured (for information about
configuring IP Phones, see

IP telephones setup and configuration

on page 53).

•

Non-SRG-specific networking and device configuration has been completed (for
information about configuring the network, see

Setting up the private VoIP network

on

page 65).

Advertising