Preinstallation preparation

553-3901-200

Standard 7.00

January 2002

System Engineering (553-3001-151)

Power Engineering (553-3001-152)

After the site has been planned, the following items must be completed prior
to ISDN BRI installation.

Wire the building between ISDN BRI terminal locations and the
distribution frame. Refer to the “Engineering guidelines” section of
ISDN Basic Rate Interface: Product Description (553-3901-100) for
wiring specifications and guidelines. For the location of the terminals
and the distribution frame, use the Building Cable Plan developed
according to instructions in the “Planning the site” section in Installation
Planning
(553-3001-120).

Install any IPE or Network Modules needed to house ISDN BRI cards as
determined in “Engineering guidelines” of ISDN Basic Rate Interface:
Product Description
(553-3901-100). Refer to System Installation
Procedures
(553-3001-210) for a description of how to install the
modules.

Unpack and inspect

ISDN BRI cards and external communication cables are shipped in separate
packages. To unpack them, follow the general precautions recommended by
computer and telephone equipment manufacturers.

Remove items that generate static charge from the installation site.

If the installation site is carpeted, spray it with an antistatic spray.

Ground yourself before handling any equipment.

Carefully remove the equipment from its packaging. Do not puncture or
tear the containers. Use scissors or a utility knife.

Inspect the equipment for obvious faults or damage. Report any damaged
component to your sales representative and the carrier who delivered the
equipment.

When unpacking the circuit cards, hold them only by their
non-conductor edges. Do not touch connector pins or components.