Nortel Networks Nortel Secure Router 4134 User Manual

Page 17

Advertising
background image

Powering up the Secure Router 4134

17

ATTENTION

When powering up for the first time, Nortel recommends that you use a direct
console connection to the Secure Router 4134. After you have completed the
initial configuration, you can use a remote connection for router management.

Procedure steps (AC power)

Step

Action

1

Turn on one power switch at a time (if you installed two AC power
supplies). Power switches are on the rear panel of the Secure
Router 4134.
The fans start immediately, and the LEDs cycle.

2

Verify that diagnostic testing is underway by observing the startup
messages on your local terminal.

3

Once the router completes the self-diagnostics tests, verify that the
System LED and the power LEDs that correspond to the power
supplies installed on your router (PS0 and PS1) are green.

4

Verify that the fan LED on the rear panel of the Secure Router 4134
is green, and air is flowing through the unit.

—End—

Procedure steps (DC power)

Step

Action

1

Turn on the DC power source.
The fans start immediately, and the LEDs cycle.

Nortel Secure Router 4134

Commissioning

NN47263-302

01.02

Standard

10.0

2 August 2007

Copyright © 2007, Nortel Networks

.