Quadra-Fire SAPPHIRE-D-CSB User Manual

Page 18

Advertising
background image

18

Quadra-Fire • Sapphire • 7055-116 Rev. D • 6/11

2. Cathedral Ceiling

Level

Cathedral Ceiling
Support Box

2 in. (51mm)
Min. below
finished ceiling

Cut hole 1/8 in. (3mm)
greater in size than
pattern of support box
as it is projected onto
roof line

Figure 5.18

Figure 5.19

Step 1.
Follow installation Steps 1 and 2 under vertical installation
section,

page 15.

Step 2.
Using the plumb-bob, mark the center line of the venting
system on the ceiling, and drill a small hole through the
ceiling and roof at this point. From the roof, locate the drill
hole and mark the outline of the cathedral ceiling support
box.

Step 3.
Remove shingles or other roof covering as necessary to cut
the rectangular hole for the support box. Cut the hole 1/8 in.
(3mm) larger than the support box outline.

Step 4.
Lower the support box through the hole in the roof until the
bottom of the support box protrudes at least 2 in. (51mm)
below the ceiling

Figure 5.18. Align the support box both

vertically and horizontally with a level. Temporarily tack the
support box in place through the inside walls and into the
roof sheathing.

Step 5.
Using tin snips, cut the support box from the top corners
down to the roofline, and fold the resulting flaps over the
roof sheathing

Figure 5.19. Before nailing it to the roof, run

a bead of non-hardening mastic around the top edges of the
support box to make a seal between it and the roof. Clean
out any combustible material from inside the support box.

Step 6.
Complete the cathedral ceiling installation by following the
same procedures outlined in steps 4 through 8 for vertical
installations,

pages 16-17.

Step 7.
Place the support clamp (provided with the support box)
inside the support box (at the bottom), and secure to the pipe
section. The clamp allows the support box to support the
weight of the pipe sections. Continue to add pipe sections
until you are above the roofline.

Cathedral
Ceiling

Trim Collar

Screws

Support

Box

Step 8.
Install the black trim collar around the outside of the cathedral
ceiling support box

Figure 5.20. The two pieces of the trim

collar slide over one another to allow for easy adjustment
around the support box. Using the six screws provided,
secure the four corners and the overlapping sections of the
trim collar to the ceiling. You may want to predrill the holes for
the overlapped sections for ease of installation.

Figure 5.20

Advertising
This manual is related to the following products: