2 thermo well method, Thermo well method – Varec 4532 User Manual

Page 30

Advertising
background image

Mounting

Average Temperature/Water Bottom Sensor and Converter

20

Installation and Operations Manual

5.3.2

Thermo well method

The flexible tube is inserted into a thermo well in the fixed pipe.

Figure 5-9: Thermo well application

The installation procedure is the same as for mounting on a fixed roof tank using the

thermo well.

Flexible tube

Element position #1

(Bottom element)

Ø26mm (1.02")

Clearance below

bottom hook

500mm (19.69")

400mm (15.75)

Gauge plate

Gas hole

Electrical compartment

Cable entry as specified

Flange

Thermo well
(Min.Ø2",
depend on sch. )

Fixed pipe

Advertising