Installation installation, Installation, 1 installation site – STIEBEL ELTRON HDB-E Si 01.11.2012 - 31.01.2013 User Manual

Page 20: 2 factory settings

Advertising
background image

20

| HDB-E Si

www.stiebel-eltron.com

INSTALLATION

Installation

Flexible water connection lines



f If the appliance is installed with flexible water connection

lines, ensure that the pipe bends do not become twisted.
Pipe bends have a bayonet fitting and are installed inside the
appliance.



f Secure the back panel at the bottom with an additional

screw.

9.1 Installation

site

!

Material damage
Install the appliance in a room free from the risk of frost.



f Always install the appliance vertically near the draw-off

point.

The appliance is suitable for undersink and oversink installations.

Note
The appliance must be fitted to a wall with sufficient
load-bearing capacity.

Undersink installation

26

_0

2

_02

_1

37

3

1

2

1 Cold water inlet
2 DHW outlet

Oversink installation

2

6

_0

2_0

2_

1

3

7

4

1

2

1 Cold water inlet
2 DHW outlet

9.2 Factory

settings

The appliances are prepared in the delivered condition:

- Power supply from “below”, installation on unfinished walls

- Water connection, installation on unfinished walls

10. Installation

This chapter describes installation in accordance with the factory
settings.

For further installation options, see chapter “Installation alterna-
tives”.

26

_0

2

_02

_1

3

6

7



f Open the appliance.

2

6

_0

2_0

2_

1

1

0

1



f Press the two locking hooks and remove the lower part of

the back panel towards the front.

2

6

_0

2_0

2

_0

8

1

0_



f Mark out the holes to be drilled; see chapter “Specification /

Dimensions and connections”.

Advertising