Installation installation – STIEBEL ELTRON HDB-E Si 01.11.2012 - 31.01.2013 User Manual

Page 23

Advertising
background image

EN

GL

ISH

www.stiebel-eltron.com

HDB-E Si |

23

INSTALLATION

Installation

Conductor cross-sections for power supply from below

If cables with a large cross-section are used, the cable grommet
can be fitted after the appliance has been installed.

1.

3.

4.

2.

26

_0

2

_02

_1

370



f Before installing the appliance, use a screwdriver to push the

cable grommet out.



f Push the cable grommet over the power cable. In the case

of a cross-section > 6 mm², enlarge the hole in the cable
grommet.



f Push the cable grommet into the back panel and click grom-

met into place.

Connecting a load shedding relay

Install the load shedding relay in the distribution board in conjunc-
tion with other electric appliances, e.g. electric storage heaters.
The relay responds when the instantaneous water heater starts.
The load shedding relay is available as an accessory.

!

Material damage
Connect the phase that switches the load shedding relay
to the indicated terminal of the mains terminal in the
appliance (see chapter “Specification / Wiring diagram”).

Mounting bracket for appliance replacement

Am existing Stiebel Eltron mounting bracket may be used when
replacing appliances (except instantaneous water heater DHF).



f Break through the back panel of the appliance for the thread-

ed stud on the pre-installed mounting bracket.

DHF replacement

26

_0

2

_02

_0

8

1

5

_



f Reposition the threaded stud on the mounting bracket (the

stud has a self-tapping thread).



f Rotate the mounting bracket through 180° and mount it on

the wall (the DHF logo is then turned towards the reader).

Installation for offset tiles

110

20

26

_0

2

_02

_1

37

1

2

1

1 Minimum contact area of the appliance
2 Maximum tile offset



f Adjust the wall clearance and lock the back panel with the

fixing toggle by turning it clockwise through 90°.

Advertising